C.I.: 4,5 MW.
Technical and Economic Valuation Update
I.C.: 5,0 MW.
Feasibility Study
I.C.: 1,8 MW.
Construction Supervision
I.C.: 17,0 MW.
Pre-feasibility Study
DAA
I.C.: 15,0 MW.
I.C.: 9,1 MW.
Technical Evaluation and Advisory
Detailed design of the unstability mitigation works
I.C.: 3,5 MW.