I.C.: 7,1 MW.
DAA
I.C.: 4,4 MW.
I.C.: 3,3 MW.
Pre-feasibility Study
Stability Analysis for the Guayabito Waste Fill
I.C.: 10,0 MW.
I.C.: 19,0 MW.
Technical Due Diligence
Pre-feasibility Study Revision
I.C.: 3,6 MW.
I.C.: 6,4 MW.
Feasibility Study
EIA