I-Consult

Work

Experience and most representative works

GEN+

Technical and Economic Valuation of 8 SHPPs

SHPP Liborina

I.C.: 3,6 MW.

Feasibility Study

SHPP San Eugenio

I.C.: 1,1 MW.

Pre-feasibility Study

SHPP Campoalegre

I.C.: 3,1 MW.

Pre-feasibility Study

SHPP Consota

I.C.: 9,9 MW.

Pre-feasibility Study

SHPP Las Violetas

I.C.: 1,2 MW.

EIA

 

SHPP Barrancas

I.C.: 4,3 MW.

Detailed Design for Construction

SHPPs Salazar I, II y III

I.C.: 18,8 MW.

Feasibility Study

Consortium CICE

Detailed Design for Construction of the

North Interceptor Shafts