I.C.: 3,5 MW.
Feasibility Study
I.C.: 5,0 MW.
EIA
C.I.: 130,0 MW.
Pre-feasibility Study
I.C.: 9,6 MW.
I.C.: 8,0 MW and 15,0 MW.
Due Diligence
Design of Slope Stabilization in Guatapé
C.I.: 15,0 MW.
Reserve Area Subtraction
I.C.: 4,3 MW.
Detailed Design for Construction