Design of Support System for Pressurized GRP Conduction Pipe
Expansion Road Design
I.C.: 9,6 MW.
Feasibility Study
C.I.: 139,0 MW.
Previous Consultation Process
I.C.: 4,0 MW.
DAA
I.C.: 3,2 MW.
C.I.: 7,2 MW.
Pre-feasibility study for two Small Hydro Power Projects
Technical advisory and earth movement design for Pampa Verde Plant
Slope Stability Analysis, Design and Construction