Technical and Economic Valuation of 8 SHPPs
I.C.: 3,6 MW.
Feasibility Study
I.C.: 1,1 MW.
Pre-feasibility Study
I.C.: 3,1 MW.
I.C.: 9,9 MW.
I.C.: 1,2 MW.
EIA
I.C.: 4,3 MW.
Detailed Design for Construction
I.C.: 18,8 MW.
Detailed Design for Construction of the
North Interceptor Shafts